hw_869162db77e281df
The ship “Jazz” runs into “engine problems” over a broken submarine cable between Lolland and Bornholm.
On 11 January 2025, the tanker “Jazz” again ran into engine problems and stopped over a broken submarine cable between Lolland and Bornholm, then it drifted near the Baltic Pipe gas pipeline and the C-Lion 1 cable. Peter Viggo Jakobsen, representative of the Defense Academy, suggests that the tanker was trying to get the best position to look at the cables or do something about them.
E/M/R/S scores
- EExistence0/4 · Not assessed
- MIntent0/4 · Not assessed
- RRussian actor link0/4 · Not assessed
- SRussian state responsibility0/4 · Not assessed
Facts
No facts
Sources
-
- Role
- discovery_lead
- Date
- 2025-01-11T11:04:47Z
On 11 January 2025, the tanker “Jazz” again ran into engine problems and stopped over a broken submarine cable between Lolland and Bornholm, then it drifted near the Baltic Pipe gas pipeline and the C-Lion 1 cable. Peter Viggo Jakobsen, representative of the Defense Academy, suggests that the tanker was trying to get the best position to look at the cables or do something about them.